Deployment Guide

Before you begin
This document describes initial hardware setup for Dell EMC PowerVault ME4 Series enclosures.
Topics:
Unpack the enclosure
Safety guidelines
Installation checklist
Planning for installation
Preparing for installation
Disk drive module
Populating drawers with DDICs
Unpack the enclosure
Examine the packaging for crushes, cuts, water damage, or any other evidence of mishandling during transit. If you suspect that damage
has happened, photograph the package before opening, for possible future reference. Retain the original packaging materials for use with
returns.
Unpack the 2U storage system and identify the items in your shipment.
NOTE:
The cables that are used with the enclosure are not shown in Figure 1. Unpacking the 2U12 and 2U24
enclosures on page 6. The rail kit and accessories box is located below the 2U enclosure shipping box lid.
Figure 1. Unpacking the 2U12 and 2U24 enclosures
1.
Storage system enclosure 2. Rackmount left rail (2U)
3. Rackmount right rail (2U) 4. Documentation
5. Enclosure front-panel bezel option 6. Rack mount ears
2U enclosures are shipped with the controller modules or input/output modules (IOMs) installed. Blank drive carrier modules must
be installed in the unused drive slots.
For enclosures configured with CNC controller modules, locate the SFP+ transceivers included with the shipment. See SFP+
transceiver for FC/iSCSI ports on page 93.
Unpack the 5U84 storage system and identify the items in your shipment.
NOTE:
The cables that are used with the enclosure are not shown in Figure 2. Unpacking the 5U84 enclosure on page
7. The rail kit and accessories box is located below the 5U84 enclosure shipping box lid.
1
6 Before you begin