Deployment Guide

2. Click Yes to confirm the upgrade, or No to cancel the upgrade. The successful image upgrade message displays.
NOTE:
One switch is upgraded at a time so that there is no loss of connectivity for the VxRail cluster.
The vCenter Task Console displays including the status of the upgrade task. The percentage that is completed on vCenter shows 50%
complete when the image has finished uploading the SmartFabric image, and 100% when SmartFabric completes the upgrade.
Server interface profile
This information describes how to configure a SmartFabric server interface profile.
The Server Interfaces Profile List displays a list of Server Profile IDs and their respective onboard status. Select a profile to view details
pertaining to that specific profile including:
Interface ID
Fabric ID
Native VLAN
Networks (if applicable) including the network name and VLAN ID
Create profile
1. Select SmartFabric vCenter, then select SmartFabric.
2. Select the specific SmartFabric instance, select Configure, then select Server Interface Profile.
54
System management