Install Guide

Table Of Contents
Installation preparation
Topics:
Multiple switch module installation
System reliability guidelines
Static-sensitive devices
Electrical considerations
Environmental considerations
Unpack
Switch module information
Multiple switch module installation
The Dell EMC PowerEdge MX7000 chassis supports up to two MXG610s switch modules in fabric C slot locationsC1 and
C2. During configuration, you must assign the first switch module that you install a unique Ethernet IP address. By default, the
switch modules use dynamic host configuration protocol (DHCP) for IP address assignment.
If you do not have a DHCP server, install and configure one switch module at a time to ensure that IP address conflicts do not
occur.
System reliability guidelines
To ensure proper cooling, performance, and system reliability, meet the following requirements:
Each of the Fabric C switch module bays at the back of the MX7000 chassis contains either a switch or a filler blade.
Replace a removed hot-swappable switch module with an identical switch module or filler blade within 60 seconds of
removal.
Do not block the ventilation areas on the front and back of the MX7000 chassis, power modules, and fans.
Follow the reliability guidelines detailed in the PowerEdge MX7000 documentation.
Static-sensitive devices
CAUTION:
Static electricity can damage the chassis and other electronic devices. To avoid damage, keep static-
sensitive devices in their static-protective packages until you are ready to install them.
To reduce the possibility of electrostatic discharge, follow these precautions:
Limit your movement. Movement can cause static electricity to build up around you.
Handle the module carefully, hold it by its edges or frame.
Do not touch solder joints, pins, or exposed printed circuitry.
Do not leave the modules where others can handle and damage it.
While the module is still in its static-protective package, touch it to an unpainted metal surface on the chassis or any
grounded rack component for at least two seconds. This action drains static electricity from the package and from your
body.
Remove the module from its package. Install it directly into the chassis without setting the module down. If you must set
down the module, put it back into its static-protective package. Do not place the module on the chassis or on a metal
surface.
Take care when you handle modules during cold weather. Heating reduces indoor humidity and increases static electricity.
3
Installation preparation 11