Owners Manual

1 Ensure that you read the Safety instructions.
2 Complete the procedure listed in Before working inside your system.
3 Remove the PCIe card.
1 To install a new server battery, hold the battery with the positive facing up and slide it under the securing tabs.
2 Press the battery into the connector until it snaps into place.
Figure 20. Installing the system battery
1 Install the PCIe card.
2 Complete the procedure listed in After working inside your system.
3 While booting, press F2 to start the System Setup and ensure the battery is operating properly.
4 Enter the correct time and date in the System Setup Time and Date elds.
5 Exit the System Setup.
Hard drive
For more information on hard drives, see the 512e and 4Kn Disk Formats whitepaper and 4K Sector HDD FAQ document at http://
Dell.com/dssmanuals.
All hard drives are connected to the server board through the hard drive backplane. Hard drives are supplied in hot swappable hard drive
carriers that t in the hard drive slots.
CAUTION
: Before attempting to remove or install a hard drive while the system is running, see the documentation for the storage
controller card to ensure that the host adapter is congured correctly to support hot swappable hard drive removal and insertion.
CAUTION: Do not turn o or restart your system while the hard drive is being formatted. Doing so can cause a hard drive failure.
Installing and removing server components 65