
Figure 66. Installing the support bracket and slot cover
Table 50. Assembly material
Description Quantity Torque (lbs/inch)
#6-32 screw 3 6 ± 0.2
3 Align the bridge board with the mezzanine card connector.
4 Install the bridge board.
112
Installing and removing server components