Users Guide
Table Of Contents
- Dell Command | Integration Suite for System Center Version 5.1 User’s Guide
- Introduction
- Install, Uninstall, and Upgrade Dell Command | Integration Suite for Microsoft System Center
- Prerequisites To Install Dell Command | Integration Suite For System Center
- Configuring A Network Access Account
- Installing Dell Command | Integration Suite for System Center
- Changing or Repairing Program Options in the Installer
- Upgrading Dell Command | Integration Suite for System Center
- Uninstalling Dell Command | Integration Suite for System Center
- Using Dell Command | Integration Suite for System Center
- Managing And Updating Distribution Points
- Creating A Dell WinPE Boot Image
- Creating A Dell Client Driver Package
- Importing Dell Command | Configure SCE Packages
- Importing Dell Command | Monitor
- Creating A Task Sequence
- Configuring Task Sequence Actions
- Creating Applications Using Dell Command | Software Gallery
- The Dell Command | Intel vPro Out Of Band Application
- Software Prerequisites
- Configuring WinRM on Client Systems
- Launching The Dell Command | Intel vPro Out of Band Application
- Account Setup
- Client Discovery
- Settings
- Remote Provisioning
- Prerequisites for Remote Provisioning
- Remote Provisioning Licensing
- Remote Provisioning Certificate Setup
- Configuring the Remote Provisioning Feature
- Upgrading Intel Setup and Configuration Software After Remote Provisioning is Enabled
- Preparing Intel vPro Client Systems For Remote Provisioning
- Provisioning Remote Client Systems
- USB Provisioning
- Indications
- Client Configuration
- Operations
- Generating Reports
- Task Queue
- Troubleshooting
- Setting Logs to Debug Mode
- Error While Uninstalling Dell Command | Integration Suite for System Center
- Authenticode Signature
- KVM Over Wireless
- Hardware Inventory Report Memory Speed is reported as Zero
- Max Password Length Change
- KVM Power Control to Boot to OS in S3
- Apply Operating System Task Sequence Action Has A Red Bang
- Related Reference
3. After selecting Wipe Client Data, you can perform one of the following actions:
● Schedule — to schedule a time for client system's hard disk wipe. For more information, see Scheduling Wipe Client
Data.
NOTE: To schedule a Remote Wipe Client Data operation, the client must be accessible through the network.
● Retrieve — to retrieve status of client system's hard disk wipe. For more information, see Retrieving Wipe Client Data
Status.
Scheduling Wipe Client Data
The Wipe Client Data feature remotely erases data on supported client system's hard drives. To schedule a Wipe Client Data:
1. Select Schedule and click Next.
The Select Clients tab is displayed.
2. Search for client systems to which you want to schedule a remote data wipe.
3. From the Available clients list select the client systems you want to manage and click the
button to move your selected
systems or press the button to move all the discovered Dell clients into the Selected clients list.
4. Click Next.
5. The Schedule Task tab is displayed.
6. You can either choose to apply the task immediately or schedule it to run later. Depending on your schedule, select one of
the following options:
● Run now — the wipe client data operations are immediately applied and displays the Running status in the Task Queue.
NOTE: If your client systems are not connected to the network, run the task again.
● Run At — wipe client disk operations are queued in the Task Queue.
NOTE: You can launch the Task Queue to view the list of completed and pending tasks.
7. Provide a brief description of the Task you are applying and click Next.
NOTE:
It is recommended to run the Retrieve Wipe Client Data task to make sure that the hard drives of the client
systems have been formatted successfully. For more information see, Retrieving Wipe Client Data.
8. Click Finish.
Retrieving Wipe Client Data Status
NOTE: Retrieve requests the status of the Wipe Client Data operation.
NOTE: After the remote hard drive wipe command has been issued from the server to the client system, the task’s status
changes to Complete. The format process on the client system will begin only after the status changes to Complete.
To retrieve the status:
1. Select Retrieve and click Next.
The Select Clients tab is displayed.
2. Search for client systems to which you want to retrieve the status of Wipe Client Data.
3. From the Available clients list select the client systems you want to manage and click the button to move your selected
systems or press the button to move all the discovered Dell clients into the Selected clients list.
4. Click Next.
5. The Schedule Task tab is displayed.
6. You can either choose to apply the task immediately or schedule it to run later. Depending on your schedule, select one of
the following options:
● Run now — the status of Wipe Client Data operations is immediately retrieved and displays the Running status in the
Task Queue.
NOTE: If your client systems are not connected to the network, run the task again.
● Run At — the status is queued in the Task Queue.
NOTE: You can launch the Task Queue to view the list of completed and pending tasks.
7. Provide a brief description of the changes you are applying and click Next.
The Dell Command | Intel vPro Out Of Band Application
35