Users Guide
• Profile Folder
• Domain Name
• User Name
• Password
For more information, see the CMC for Dell PowerEdge FX2/FX2s Online Help.
3. Click Test Directory to verify whether the directories are readable and writeable.
4. Click Test Network Connection to verify if the network share location is accessible.
5. Click Apply to apply the changes to the network share properties.
NOTE:
Click Back to return to the Server Component Update page.
Lifecycle Controller job operations
NOTE: To use this feature, you must have an Enterprise License.
You can perform Lifecycle Controller operations such as:
• Re-install
• Rollback
• Update
• Delete Jobs
Only one type of operation can be performed at a time. Components and devices that are not supported
may be listed as part of the inventory, but do not permit Lifecycle Controller operations.
To perform the Lifecycle Controller operations, you must have:
• For CMC: Server Administrator privilege.
• For iDRAC: Configure iDRAC privilege and Log in to iDRAC.
A Lifecycle Controller operation scheduled on a server may take 10 to 15 minutes to complete. The
process involves several server reboots during which the firmware installation is performed, which also
includes a firmware verification stage. You can view the progress of this process using the server console.
If there are several components or devices that need to be updated on a server, you can consolidate all
the updates into one scheduled operation thus minimizing the number of reboots required.
Sometimes, when an operation is in the process of being submitted for scheduling through another
session or context, another operation is attempted. In this case, a confirmation message is displayed
indicating the situation and the operation must not be submitted. Wait for the operation in process to
complete and then submit the operation again.
Do not navigate away from the page after an operation is submitted for scheduling. If an attempt is made,
a confirmation message is displayed allowing the intended navigation to be cancelled. Otherwise, the
operation is interrupted. An interruption, especially during an update operation may cause the firmware
image file upload to be terminated before proper completion. After an operation has been submitted for
scheduling, ensure that the confirmation message indicating that the operation has been successfully
scheduled is acknowledged.
56