Users Guide
PE FPGA IMAGE INFORMATION :
---------------------------------------------------------------------
FPGA Name Version
CPLD 16
PE PoE-CONTROLLER IMAGE INFORMATION
---------------------------------------------------------------------
Type Version
PoE Controller 2.65
De-provisioning a Port Extender
To remove the provisioned configuration from a PE, follow one of the de-provisioning procedures in this section.
• To de-provision a PE that is online, shut down its cascade ports and then enter the no pe provision pe-id command;
for example:
Dell(conf)# interface range te 1/0 , te 1/12
Dell(conf-if-range-te-1/0,te-1/12)# shutdown
Dell(conf-if-range-te-1/0,te-1/12)# exit
Dell(conf)# no pe provision 10
• To de-provision a PE that is offline, enter the no pe pe-id command; for example:
Dell(conf)# no pe 10
• To de-provision all attached PEs, disable the extended-bridge feature on the parent C9010. All attached PEs (online and
offline) are brought down. All PE configurations are removed. For example:
Dell(conf)# no feature extended-bridge
This command will disable the Extended-Bridge feature which will bring down all the PEs and
remove all the PE configs.
Proceed with Extended-Bridge feature disable? [yes/no]:yes
Troubleshooting a Port Extender
Normally you manage a PE through the C9010 console attached to the parent C9010 switch. However, if a port extender
cannot connect to the C9010, use the following commands from a PE console to troubleshoot the error condition.
cd Change current directory
clear Reset functions
copy Copy from one file to another
delete Delete a file
diag Run diagnosis
dir List files on a filesystem
disable Turn off privileged commands
enable Turn on privileged commands
exit Exit from the EXEC
format Format a filesystem
hostname Set system's network name
no Reset a command
offline Take a PE stack unit offline
online Bring a PE stack unit online
power-cycle Power-cycle the unit(s)
pwd Display current working directory
reload PE Halt and perform a cold restart
rename Rename a file
reset Reset selected PE
show PE Show running system information
telnet-peer-stack-unit Open a telnet connection to the peer stack-unit
upgrade Upgrade subcommands
Dual Homing
Dual homing provides support to manage and control the PEs from both the primary and the secondary chassis in a VLT setup.
The C9010 switch supports dual homing using C1048P port extenders. You can also stack the C1048 port extenders in a dual
Port Extenders (PEs) 695