Installation manual

Installing and Maintaining the C300 System 41
9
Powering Up
Before you supply power to the chassis, Dell Networking recommends that you re-inspect your
equipment rack and chassis. Verify that:
The equipment rack or properly secured and grounded.
The chassis is bolted and secured into your equipment rack.
Make sure the ambient temperature around the unit (which may be higher than the room temperature) is
within the limit specified for the unit.
Make sure there is sufficient airflow around the unit.
Make sure electrical circuits are not overloaded – consider the nameplate rating of all the connected
equipment, and make sure you have over current protection.
At least one supply module at highline or two supply modules at lowline are installed.
All supply module is properly installed.
All supply modules are switched to the OFF (bottom) position.
The remote source complies with the input specifications in the section System Specifications.
Cables connect to the remote source.
The fan tray is installed and cannot be removed by pulling on the fan tray handle.
At least one RPM is installed.
All line cards and RPMs are properly installed and secured.
All chassis slots are filled. Blank panels and covers are installed in all empty slots.
Make sure no objects are placed on top of the unit.
Make sure the equipment is properly grounded.