Installation manual
Installing and Maintaining the C300 System 13
3
Preparing the Site
Site Selection Criteria
Before beginning the installation process, make sure that the area where you intend to install your C300
meets the following safety requirements:
• It is in a restricted access area.
• It is in a dry, clean, well-ventilated, temperature-controlled room, that is away from heat sources such as
hot air vents or direct sunlight.
• It is away from sources of severe electromagnetic noise.
• Power supply is adequate for power requirements.
• Connect the C300 System to the appropriate branch circuit protection as defined by local
electrical codes.
WARNING: The C300 does not have a main disconnect device installed. It is the responsibility of the
installer to provide a suitable disconnecting device in the building installation and ensure that it is located/
installed near the equipment and is easily accessible.
• It is positioned in a rack with adequate space in the front, rear, and sides of the unit for proper
ventilation, access to cables, and maintenance access.
• Allow at least six inches (16 cm) of clearance around the side intake and exhaust vents.
• Allow at least 12 inches (30.5 cm) between two C300s or an C300 and another side airflow
chassis.
• Allow at least 18 inches in the front and 20 inches in the rear of the rack.
NOTE: The C-Series does not have an air filter, so take special care in making sure that the installation site
and the chassis itself are cleaned regularly.