Owner's Manual
Configuring Dell Integration Pack Activities 67
4
For information about the settings on the
General
and
Run Behavior
tabs,
see Common Configuration Instructions for All Activities.
5
Click
Finish
.
NOTE: If you do not include the optional Timeout property the activity will not
wait for the specified persona or VMRack to start. Since persona booting
takes some time, you can choose to poll the state if you are not using the
timeout property.
Configuring the Stop Activity
To configure the Stop activity:
1
From the
Activities
pane, drag a
Stop
activity to the active runbook.
2
Double-click the
Stop
activity.
The
Properties
dialog box is displayed.
3
Configure the
Properties
tab:
a
In the
Configuration
section, click the ellipsis button (...), and then
select the Dell AIM configuration that you want to use for this
activity. Click
OK
.
b
In the
Properties
section, enter a value for each of the required
properties and the applicable optional properties. If the property is
Lookup-enabled, you can click the ellipsis (…) button next to the text
box to browse for a value.
You can also use returned data to automatically populate the value of the
property from the data output by a previous activity in the workflow.
To use returned data
a
Right-click the property value box, click
Subscribe
, and then click
Returned Data
.
b
Click the
Activity
drop-down box and select the activity from which
you want to obtain the data.
c
To view additional data elements common across the runbook, select
Show Common Returned Data
.
d
Click the returned data element you want to use, and then click
OK
.