Users Guide
IOA Fabric Pre-Deployment
To prepare the IOA fabric for deployment, complete the following tasks using the Pre-deployment
Configuration wizard.
1. Pre-Deployment IOA — Management IP
2. Pre-Deployment IOA — VLAN Configuration
3. Pre-Deployment IOA — SNMP and CLI Credentials
4. Pre-Deployment (IOA) — Software Images
5. Pre-Deployment IOA — Summary
Layer 2 VLT/ Advanced Fabric Pre-Deployment
To prepare the Layer 2 VLT or Advanced fabric designs for deployment, complete the following tasks
using the Pre-deployment Configuration wizard.
NOTE: The pre-deployment processes for a Layer 2 VLT standard fabric and for an advanced fabric
are similar. The exceptions are the Storage Facing Ports screen applies only to standard fabric pre-
deployment and the Change Port Status screen applies only to advanced fabric pre-deployment.
1. Protocol Configuration for a Layer 2 VLT fabric:
a. L2 VLT Pre-Deployment — Uplink Configuration
b. L2 VLT Pre-Deployment — VLAN Configuration
c. Pre-deployment L2 VLT — Port Channel Configuration
d. L2 VLT Pre-Deployment — Storage Facing Port
e. L2 VLT Pre–Deployment — VLAN Mapping
2. Pre-Deployment — Change Port Status (Advanced Fabric only)
3. Pre-Deployment — Assign Switch Identities
4. Pre-Deployment — Management IP
5. Pre-Deployment — License Update (Advanced Fabric Z9500 switches only)
6. Pre-Deployment — SNMP and CLI Credentials
7. Pre-Deployment — Software Images
8. Pre-Deployment — DHCP Integration
9. Pre-Deployment — Summary
Layer 3 Distributed Core Fabric Pre-Deployment
To prepare the Layer 3 Distributed Core fabric for deployment, complete the following tasks using the
Pre-deployment Configuration wizard.
1. Protocol Configuration for Layer 3 fabric:
• Pre-Deployment L3 DC — Fabric Link Configuration
• Pre-Deployment L3 DC — Uplink Configuration
• Pre-Deployment L3 DC — Downlink Configuration
2. Pre-Deployment — Assign Switch Identities
3. Pre-Deployment — Management IP
Configuring and Deploying the Fabric
97










