Users Guide
• Three-tier filtering options — All, Core, Aggregation and Access
8. Select the switches for standby partition activation and then click the >> button to move them to the
Selected area.
9. Click Next jn.
10. From the Schedule screen, select one of the following options and click Next:
• Run Now — Schedule the job to run immediately.
• Schedule job to start on — Schedule the job to run later.
11. Review the Summary settings and click Finish.
Scheduling a Back Up Switch Configuration
1. From the menu, click Network > Fabric Name and then click the Maintenance tab.
2. Click the Backup Switch button.
The switch backup options appear.
3. Click Schedule Switch Backup.
The Switch Backup window appears.
4. In the Name field, enter the name of the software job name.
5. (Optional) In the Description field, enter a description.
6. Click Next.
The Select Switches screen appears.
7. From the Available drop-down menu, select the type of switches to update.
8. In the Available Switches area, select the types of switches to update:
• Two-tier distributed core filtering options — All, Spine, and Leaves
• Two-tier VLT options — All, Aggregation and Access
• Three-tier filtering options — All, Core, Aggregation and Access
9. To move the selected switches to the Selected Switches area, click the >> button and then click
Next.
The Schedule screen appears.
10. In the Start area, select one of the following options:
• Run Now — Run the job now.
• Schedule job to start — Specify when to schedule the job.
11. In the Summary screen, review your settings, and then click Finish. For more information about
backing up switches, refer to
Viewing and Editing the Switch Backup Configuration.
Jobs
219










