Personal Computer User Manual
Table Of Contents
- Safety Instructions
- Preface
- Getting Started
- PowerEdge Cluster Components
- Minimum System Requirements
- Basic Installation Procedure
- Adding Peripherals Required for Clustering
- Setting Up the Cluster Hardware
- Cabling the Cluster Hardware
- Updating System BIOS/Firmware for Clustering
- Setting Up the Shared Storage Subsystem Hard-Disk...
- Setting Up the Internal SCSI Hard-Disk Drives
- Installing and Configuring Windows NT Server Enter...
- Installing and Configuring the Microsoft Cluster S...
- Installing PowerEdge Cluster Applications
- Checking the System
- Cabling the Cluster Hardware
- Configuring the Cluster Software
- Low-Level Software Configuration
- High-Level Software Configuration
- Installing Intel LANDesk® Server Manager
- Choosing a Domain Model
- Static IP Addresses
- IPs and Subnet Masks
- Configuring Separate Networks on a Cluster
- Changing the IP Address of a Cluster Node
- Naming and Formatting Shared Drives
- Driver for the RAID Controller
- Updating the NIC Driver
- Adjusting the Paging File Size and Registry Sizes...
- Verifying the Cluster Functionality
- Uninstalling Microsoft Cluster Server
- Removing a Node From a Cluster
- Setting Up the Quorum Resource
- Using the ftdisk Driver
- Cluster RAID Controller Functionality
- Running Applications on a Cluster
- Troubleshooting
- Upgrading to a Cluster Configuration
- Stand-Alone and Rack Configurations
- Cluster Data Sheet
- PowerEdge Cluster Configuration Matrix
- Regulatory Compliance
- Safety Information for Technicians
- Warranties and Return Policy
- Index

B-6 Dell PowerEdge Cluster (PowerEdge 4200) Installation and Troubleshooting Guide
R
ack-Mounting the Network
Switch
For the 3Com Superstack II Switch 3000 TX to be acces-
sible to the network interface controller (NIC) connectors
on each cluster node, the switch must be placed behind
the keyboard tray with the front of the switch facing
toward the back of the rack.
Use the following procedure to install the network switch
in the rack.
1. If present, remove all self-adhesive pads from the
underside of the network switch.
2. At the back of the rack along one of the vertical
rails, locate the first square hole right below the
mounting rail for the Apex Outlook switch box
(which connects the mouse, keyboard, and moni-
tor), and install a nut cage in the hole. Moving
downward, skip the second and third holes and
install a nut cage in the fourth hole.
3. Attach two cage nuts on the back vertical rail on
the other side of the rack directly opposite of the
two cage nuts you just installed.
4. With the front of the network switch facing you,
position the mounting bracket over the mounting
holes on one side of the switch, as shown in
Figure B-4.
Figure B-4. Attaching the Rack-Mounting
Hardware on the Network Switch
5. Insert three of the screws included with the
mounting hardware and tighten them securely.
6. Insert the mounting bracket on the opposite side
of the unit.
7. Position the network switch inside the rack
behind the keyboard tray with the front of the
switch facing toward the back of the rack (see
Figure B-3).
8. Align the holes on the mounting hardware with
the cage nuts that were installed earlier and
secure them with #10 flat washers and #10-32
screws.
Refer to Chapter 2, “Cabling the Cluster Hardware,” for
instructions on cabling the network switch.
CAUTION: Do not connect cables to the network
switch prior to installing the switch in the rack.
rack-mounting bracket
front of
network switch
screws (3)