Installation Guide
Table Of Contents
- Dell EMC PowerSwitch N2200-ON Series Installation Guide
- About this guide
- N2200-ON Series switch
- Site preparations
- N2200-ON Series switch installation
- Power supply
- Fans
- Management ports
- Installation using ONIE
- Specifications
- Dell EMC support
Wall mount
ceiling mount
One RU ReadyRails installation
Install the N2200-ON Series switch using one of the following installation instructions. You can install the ReadyRails system using the 1U
tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post
flush mount, two-post center mount, or four-post threaded mount.
NOTE: You must order the ReadyRails mounting supplies for this installation separately.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
26 N2200-ON Series switch installation