Installation manual

Dispensing Models Service and Installation Manual
3
For customer service, call (800) 733-8829, (800) 773-8821, Fax (989) 773-3210, www.delfield.com
Receiving & Inspecting Equipment ...........................................3
Serial Number Location .............................................................4
Warranty Information .................................................................4
Regulatory Certifications ............................................................ 4
Specifications ..........................................................................5-8
Installation ................................................................................. 9
Operation .............................................................................10-11
Adjusting Self-Leveling Dispenser ......................................12-13
Maintenance ............................................................................. 14
Troubleshooting Reference Chart ............................................15
Wiring Diagrams ......................................................................16
Replacement Parts List .......................................................17-18
Standard Labor Guidelines ......................................................19
Contents
Receiving And Inspecting The Equipment
Even though most equipment is shipped crated, care should
be taken during unloading so the equipment is not damaged
while being moved into the building.
1. Visually inspect the exterior of the package and skid or
container. Any damage should be noted and reported to
the delivering carrier immediately.
2. If damaged, open and inspect the contents with the
carrier.
3. In the event that the exterior is not damaged, yet upon
opening, there is concealed damage to the equipment
notify the carrier. Notification should be made verbally
as well as in written form.
4. Request an inspection by the shipping company of the
damaged equipment. This should be done within 10
days from receipt of the equipment.
5. Check the lower portion of the unit to be sure the casters
are not bent.
6. Retain all crating material until an inspection has been
made or waived.
Uncrating the Equipment
First cut and remove the banding from around the crate.
Remove the front of the crate material, use of some tools will
be required. If the unit is on legs remove the top of the crate
as well and lift the unit off the skid. If the unit is on casters it
can be rolled off the skid.