Installation manual

Spa Eclipse Installation & Operations Manual
2
c. Installthecheckvalveinthetubingabovethewaterline.Ensure
flowdirectionisfromtheSpaEclipsetothevacuumsource.
d.Securealltubingconnectionswithhoseclamps.
4. Electrical
a.Verify that there is no power to the spa and connect the Spa
Eclipsecordintothematingconnector(s)onthespacontrolbox.
b.Wherepossible,routetheSpaEclipsepowercordawayfrom
otherelectricallines.Avoidroutingthepowercordparalleltoany
low-voltagesignalwires.
5. Operation
a.Withthespafilledtotheproperlevel,runthespacontroller
throughseveralcycles.
i. Verify that the green light on the Spa Eclipse turns on and off
asrequiredbythecontroller.
ii.Verifythatgasisflowingintotheinjector(thereshouldbeno
waterinthetubingandverysmallbubblesatthereturn).
iii.Verifythatwaterdoesnotpushpastthecheckvalveduring
anyspacycle.
iv.Checkforandcorrectanyleaksintheozonetubing.
6. System Maintenance
a.OrderingInformation:
Tolocatethedealernearestyoucall1.800.676.1335ext.232
Bepreparedwiththefollowinginformation:
•Name •DatePurchased
•Address •DealerName
•Model#
b.StandardReplacementPartsList:
i. OzoneCheckValve.............................................7-1140-01
ii.OzoneTubing.......................................................7-0075
iii.InletFilterAssembly.............................................9-0858-01
 TheOzoneCheckValve(Itemi)shouldbereplacedannually.
c. Regularlyinspectozonesupplytubingforcracksorwear.Also
checktomakesurenowaterispresentbetweentheCheckValve