Owner`s manual
12
30SB,36SB,45SB
Rev Nov2014
Snow BEAST
Assembly Instrucons
Step 7: Auger and Transmission Control Cables
Controlcablesarepresetatthefactory,butmayrequireaddionaladjustmentforopmaloperaon.Control
cablesrequireperiodicinspeconandmaintenancetomaintainopmalperformance.
1. Locatetheblackcableontherightside(standingfromtheoperatorposion)ofthesnowblower.Ensurethe
cableisproperlyseatedintheplascguidepulleyattherearofthechassis.
2. Aachthecabletothethreadedendunderthedrivecontrolhandle.
Thecableadjust menttubewithZrodmay
needtobeaachedtotheboomofthehandle.
3. Screwclockwisetosecureunlallthreadsareengagedintheadjustmenttube.Tightenlocknutswhencorrect
tensionisachieved.
4. Thedriveandimpellercableswill
beatcorrecttensionwhenthecablesareproperlyaachedtothehandles
andthecablehasa1inch deflecontoeithersidewhenpushedwithafingerasshown.
RepeatthesameprocessfortheAuger/Impellerengagementcableonthelesideofthesnow
blower.
Correctamountof
defleconshown
Need Help With Assembly?
(919)‐550‐3221
Transmission
ControlCable
Auger/Impeller
ControlCable