Specifications
7
2.3 Assembly Foundation and Mast
1st step:
- build soil
- build in ductwork (not in the picture)
- arrange reinforcement mat to support
the bracing (proposal to create a round
bracing)
(dimensions of the foundation see page 8
and 9)
- build in reinforcement ( Pos. 2
plan of reinforcement ).
use reinforcing bar spacer
2nd step:
- build in staff steel (Pos. 2 plan of
reinforcement) (also see step 4)
- build in bearing for mast (high ca. 10 cm)
in central position
- build in reinforcement (Pos. 1 plan of
reinforcement) in central position
ATTENTION: ductwork has to be within the
mast
3rd step:
- build in staff steel (Pos. 1 plan of
reinforcement)
4th step:
- build in bracing for quiver (40 x 40cm)
- errect and fix staff steel (Pos. 2 plan of
reinforcement)
5th step:
- Build in bracing for the foundation
(suggestion: galvanized sheet metal)
- bracing for the foundation has to be fixed in
that way the force of the concrete can be
accepted. (suggestion: additional protection
by a tension belt)
- filling and compaction of the foundation
with concrete (without quiver)