Specifications

2
List of contents
1 Security advices / Intended use…………………………………………. 4
2 Assembly
2.1 Short assembly instruction.…………………………………………………... 5
2.2 Scope of delivery……………………………………………………………… 6
2.3 Foundation and mast …………………………………………………………. 7
2.4 Integrated motor east-west (IMO) …………………………………………… 10
2.5 Base frame……………………………………………………………………… 11
2.6 Elevation motor (EMO)………………………………………………………... 12
2.7 Module carry system…………………………………………………………… 13
2.8 Modules…………………………………………………………………………. 14
2.9 Control unit assembly.…………………………………………………………. 15
3 Technical characteristics
3.1 Functional characteristics……………………………………………………… 16
3.2 Data sheet energy converter V………………………………………………… 17
3.3 Connection diagramm CCB with energy converter V…..……………… 18
4 Certificates
4.1 Declaration of conformity..…..…..…………………………………………….... 19
4.2 Declaration of commitment……………………………………………………... 20
5 Trouble shooting / Maintenace
5.1 Trouble shooting…….…………………………………………………………… 21
5.2 Maintenance……………………………………………………………………… 22
Start-up protocol…………........................................................................... 23
Fault report…………………………………………………………………………. 24
IMPORTANT INSTRUCTIONS!!
The start-up protocol (page 23) should be filled out on initial operation and faxed to
the company DEGERenergie within 4 weeks of start-up. The entitlement to warranty
claims for material defects will be only extended from the statutory two-year period
warranty to three years if this protocol is submitted within the specified timeframe.
A fault report (page 24) must be submitted in order to process complaints.
Complaints cannot be processed if fault reports have not been filled out correctly!!