Specifications
10
1st step:
- set rotating head (Pos. 2) onto the flange
on the top of the mast.
The IMO unit should roughly point south (+/-
30°) while being screwed tight.
2nd step:
- screw rotating head (Pos. 2) with the
flange (Pos. 1) by using bolts M 16x 45
(Pos. 9) and washers M 16 (Pos. 10).
torque 200 NM.
2.4 Assembly of Integrated Motor
East-West (IMO)
Pos.10
Pos.2
7th step:
- mounting cover for mast with „boomerang“ (Pos. 15)
on the top of the mast (drive in with a rubber mallet)
The tip of the “boomerang” must point in a southward
direction (+/-3°). Use a GPS device or refer to the
surveyor’s plan of the property to determine the south
position. (a compass is not precise enough)
Pos.1
Pos.15
ATTENTION! Cable feed through
Use flexible rubber pipes. Insert the cable screw
connections into the plastic cover in accordance with the
corresponding wiring.
Pos.9
M16x45
Pos.1
Attention needs not be paid to the position of
the bore holes.