Installation Guide

STEP 1:
Drill two holes in the requied position on the wall using a
14mm masonry drill bit ,to depth of 75mm.
STEP 2:
Push a wall plug into each hole.
STEP 3:
Screw a fixing bolt into each fixing plug using an 8mm
spanner until the spanner contacts the wall.
STEP 4:
Place the basin in position against the wall.Locating the
fixing bolts through the holes in the rear of the basin.
Push a plastic washer followed by a metal washer, onto
each fixing bolt.
STEP 5:
Screw a metal nut onto each fixing bolt to secure the
basin.
Caution: Do not over-tighten,as this may damage the
ceramic.
(+1) 312-626-9466
www.deervalleybath.com
5