Operating instructions
draft
Dedicated Micros ©2008
82
DV-IP HD
Scheduled It is possible to force the unit to archive
images at a scheduled time, enter a
time to activate this function each day.
Polled This will set the unit to activate archive
download at regular intervals, the
time period is in minutes and is the
time between the end of one archive
download and the start of the next.
Manual only The archive process will commence
when the user initiates the action.
Schedule time hh mm If ‘Scheduled’ has been selected in Download Options, enter
a time for the download to take place each day.
Poll time Minutes If ‘Polled’ has been selected in Download Options, enter the
number of minutes which will elapse between the conclusion
of one archive download and the start of the next.
Clear video protection after download This automatically clears the image protection from
successfully downloaded images.
Watermark each partition
This enables a watermark to be generated and stored in a
text le downloaded with the video to the FTP server (for
each image partition). This watermark is logged in the
log le.
FTP download overrides Powermanager
When selected, if the unit is in the process of an FTP
download and the unit is sent into reset, the reset will be
not begin under the FTP process has completed.