Instructions / Assembly
112408
• NOTE: Cutout Template Included
Item Description Qty
A
Round Vitrous China Vessel with Overflow
1
A
Clearance Hole Cut Opening
• STEP #2
o Check for cutout alignment by placing Lavatory (A) in desired mounting position.
• STEP #1
o Affix Template provided for Countertop at desired location with Cellophane Tape.
o Mark guidelines on Countertop in several places.
o Drill a clearance hole approximately ¼" to ½" (0.635cm – 1.27cm) inside the perimeter line of
Template.
o Cut opening following the perimeter line of Template.
Lavatory
Countertop
Model NuMber: 1451
®
SerieS (lVC1451-301)