Assembly Instructions
A
B
C
D
DETAIL A
DETAIL D
DETAIL C
DETAIL B
2 7/8” FROM OFFSET IN
FRONT FLANGE
17 1/4” FROM FRONT EDGE OF FLANGE
INVERT BRACKET
TO MARK
2 7/8” FROM FRONT
EDGE OF FLANGE
2 7/8” FROM REAR
EDGE OF FLANGE
FRONT
REAR
➡
FRONT
OF VAN
➡
FRONT
OF VAN
PREPARE VAN: INSTALL TIEDOWN BRACKETS
STEP 3: Drill 5/16” clearance holes where marked.
STEP 4: Mount bracket to underside of fore-aft body ledge in
detail views A-D.
BRACKETS AND HARDWARE (NUTS AND BOLTS) ARE
FOUND IN BAG MARKED TIE-DOWN BRACKETS.
STEP 1: Locate bracket locations along fore-aft body ledge
per dimensions shown in detail views A-D. Note: the three
large holes of each bracket will be pointing upwards.
STEP 2: Use marking pen to mark outermost bracket hole
locations according to detail views A-D. Invert bracket to
mark, as shown in detail B. NOTE: In detail B, you may need
to temporarily remove jack tools to mark and drill holes.