Product Manual B
MF3 & MF4 | v.1 | Page 12
DECKED.COM | #DECKEDUSA | @DECKEDUSA
INSTALL: DECK HALVES
• Loosely place deck panel on side stud, center vert and ammo can.
• Shift ammo can forward, rearward, L-R, as necessary to align with fully seated deck panel.
• Loosely assemble:
• Five bolts through deck panel into center vert; BAG S1.
• Four bolts with nylon and rubber washers installed as shown through deck panel into stud;
BAG S1, BAG MS WASHERS.
• Eight bolts with nylon and rubber washers installed as shown through deck panel into ammo can;
BAG S1, BAG MS WASHERS. Use the four nylon washers from BAG S1 and remaining 20 nylon washers
from BAG MS WASHERS to complete this step for both sides.
• Tighten all S1 bolts.
• Securely tighten C-Channel/ammo can nuts and bolts.
• Repeat other side (making sure you don't forget to securely tighten C-channel/ammo can nuts and bolts).
DETAIL A
S1
➡
CAB
NYLON WASHER
RUBBER WASHER
RECOMMENDED TORQUE:
Bolts in labeled bag S1 - 27 in-lb.