Product Manual B

MF3 & MF4 | v.1 | Page 12
DECKED.COM | #DECKEDUSA | @DECKEDUSA
INSTALL: DECK HALVES
Loosely place deck panel on side stud, center vert and ammo can.
Shift ammo can forward, rearward, L-R, as necessary to align with fully seated deck panel.
Loosely assemble:
• Five bolts through deck panel into center vert; BAG S1.
Four bolts with nylon and rubber washers installed as shown through deck panel into stud;
BAG S1, BAG MS WASHERS.
Eight bolts with nylon and rubber washers installed as shown through deck panel into ammo can;
BAG S1, BAG MS WASHERS. Use the four nylon washers from BAG S1 and remaining 20 nylon washers
from BAG MS WASHERS to complete this step for both sides.
Tighten all S1 bolts.
Securely tighten C-Channel/ammo can nuts and bolts.
Repeat other side (making sure you don't forget to securely tighten C-channel/ammo can nuts and bolts).
DETAIL A
S1
CAB
NYLON WASHER
RUBBER WASHER
RECOMMENDED TORQUE:
Bolts in labeled bag S1 - 27 in-lb.