Product Manual B
MF3 & MF4 | v.1 | Page 10
DECKED.COM | #DECKEDUSA | @DECKEDUSA
INSTALL: MOUNTING + CABSIDE ATTACHMENT
• While supporting both ends, lift center vert + stud + cabside vert assembly in truck bed. Position against cabside
panel of bed with stud bracket tailgate side of cabside bracket.
• DETAIL A: Install a 3/4" length bolt and flanged nut and tighten securely; BAG PREP-MF3/MF4.
• Repeat other side.
DETAIL A
3/4" BOLT
FLANGED NUT
IMPORTANT: Make sure centerline
arrows on cabside vert are aligned
with your centerline mark (blue).
➡
A
➡
CAB
CAB
RECOMMENDED TORQUE:
Bolts in labeled bag PREP-MF3/MF4 - 53 in-lb.