Operation Manual
6
GT 530A DDR_G30A/AE _IO_V4.0 09/2013
Before operating the boiler, make sure you fully
understand its method of operation. Your heating
contractor should always perform the initial start-up
and explain the system. Any warranty is null and void if
these
Flue gas smell
• Deactivate heating equipment.
• Open windows and doors.
• Do not try to light any appliances.
• Do not touch any electrical switches, do not use
any phone in your building.
• Immediately call your heating contractor or gas
supplier from a neighbour’s phone. Follow the gas
supplier’s instructions.
• If you cannot reach your gas supplier, call the re
department.
Working on the equipment
All personnel working on the equipment or the heating
system must have the proper qualications and hold all
necessary licenses.
Ensure main power to equipment, heating system,
and all external controls have been deactivated. Close
main gas supply valve. Take precautions in all instances
to avoid accidental activation of power during service
work.
Dangerous conditions
• Deactivate main power immediately.
• Close gas supply valve.
CAUTION
Incomplete combustion and poisonous gases result if
the fresh air intakes in the mechanical room are closed.
Never close these openings.
Maintenance and cleaning
Regular inspection and service by a qualied heating
contractor is critical to the performance of the boiler.
Neglected maintenance impacts the warranty;
regular cleaning and maintenance ensures clean,
environmentally friendly and efcient operation. We
recommend a maintenance contract with a qualied
heating contractor.
For safe operation
We recommend that you frequently:
• Check for debris which could obstruct the ow
of ue gases. The vent or chimney must not be
blocked. A blocked or partially blocked vent or
chimney can cause ue gases to leak into the
structure. Flue gases leaking into the house can
Safety Information
Operation
cause injury or death. Blocked or partially blocked
chimneys must have the blockage removed by a
qualied heating contractor.
• Check pressure gauge for correct system (water)
pressure.
• Check for water on the oor from the discharge
pipe of the pressure relief valve or any other pipe,
pipe joint, valve or air vent.
• Check for moisture, water, or appearance of
rust on the ue gas pipes, their joints as well as
vent dampers, or side wall vent terminals (if so
equipped).
• Ensure that nothing is obstructing the ow of
combustion and ventilation air and no chemicals,
propane tanks, garbage, gasoline, combustible
materials, ammable vapors and liquids are stored
(not even temporarily) in the vicinity of the boiler.
• Do not allow unsupervised children near the boiler.
• Service/inspection of the boiler and the system is
recommended once a year. Maintenance, service
and cleaning are specied in the Installation
instructions.
• Before the heating season begins, the boiler with its
burners should be serviced by a qualied heating
contractor. Service contracts may be established
through gas suppliers or licensed contractors in
your area.
WARNING
There are no user serviceable parts on the boiler, burn-
ers or control. Failure to heed this warning can cause
property damage, severe personal injury, or loss of life.
CAUTION
Improper installation, adjustment, service, or mainte-
nance can cause ue products to ow into living space.
Flue products contain poisonous carbon monoxide gas
which can cause nausea or asphyxiation resulting in
severe personal injury or loss of life.
CAUTION
Should overheating occur or the gas supply fail to
shut off, do not disconnect the electrical supply to the
pump. Instead, shut off the gas supply at a location
external to the appliance.
CAUTION
This appliance may sometimes contain crystalline sil-
ica. When installing or removing this appliance, you
should wear protective gloves, clothing and mask to
prevent any type carcinogenic illness.










