Operation Manual
49
GT 530ADDR_G30A/AE _IO_V4.0 09/2013
42. Fitting the rails (FA17 to FA27)
Boiler
Package
C
Package
D
GT 530A-15 FA 25
GT 530A-16 FA 26
GT 530A-17 FA 27
GT 530A-18 FA 16 FA 17
GT 530A-19 FA 16 FA 18
GT 530A-20 FA 16 FA 19
GT 530A-21 FA 16 FA 20
GT 530A-22 FA 16 FA 21
GT 530A-23 FA 16 FA 22
GT 530A-24 FA 16 FA 23
GT 530A-25 FA 16 FA 24
GT 530AE-26 FA 18 FA 24
GT 530AE-27 FA 19 FA 24
GT 530AE-28 FA 20 FA 24
GT 530AE-29 FA 21 FA 24
GT 530AE-30 FA 23 FA 24
GT 530AE-31 FA 24 FA 24
GT 530AE-32 FA 24 FA 24
Length required while assembling the 2-piece rails (boiler with 18 to 25 sections):
Number of sections 18 19 20 21 22 23 24 25
Length(mm-A)
98
.
43”
/2500 103”/2615 108.87”/2765 114.25/22875 116.75/2965 121.06/3075 124.83”/3165 12893/3275
Length required while assembling the 2-piece rails (boiler with 26 to 32 sections):
Number of sections 26 27 28 29 30 31 32
Length(mm-A)
133.2/3385 1375/3495 141.9/3605 146.2/3715 150.5/3825 154.9/3935 159.2/4045
A : GT 530A-15 to GT 530A-17
Fix the upper rail with H8 x 30 screws and L8 washers
(the rst hole from the front end of the rail must be
opposite the rst fastening bracket, and similarly with
the other brackets).
Push the installation behind the lower rail and
underneath the boiler.
Join the pieces of installation to each other with the
clips.
B : GT 530A-18 to GT 530A-25
Fix the upper rail with H8 x 30 screws and L8 washers
(the rst hole from the front end of the rail must be
opposite the rst fastening bracket, and similarly with
the other brackets).
Fix the additional upper and lower rails, making sure
you comply with dimension A (refer to the table below).
Push the installation behind the lower rail and
underneath the boiler.
Join the pieces of installation to each other with the
clips.
C: 26-30 sections
Some modication may be required
D
D
A
D
D
C
Front Front
Assembly and Set up
A










