Operation Manual
43
GT 530ADDR_G30A/AE _IO_V4.0 09/2013
34. Installing the top insulating material (FA37 to FA41)
35. Installing the intermediate piece (MR 245)
Assembly + Set up
Put in place the 2 pieces of insulating material (width 600 mm; packages FA37 to FA41) on the body of the boiler.
Push the insulating material under the front and rear crosspieces.
26-32 sections Use provided spare insulation and cut to t the gap.
Assemble the intermediate piece on the assembly rods
by tting one slotted side onto one rod and using the
exibility of the other rod.
GT 530A-18 to Gt 530AE-32
GT 530A-18 to Gt 530A-25










