Operation Manual
40
GT 530A DDR_G30A/AE _IO_V4.0 09/2013
GT 530A-16 to GT 530A-25
GT 530AE-26 to GT 530AE-32
GT 530A-15
1
1
1
Package FA111
Package FA112 to FA121
Package FA126B to FA132B
• GT 530A-15
Place the nozzle turned outside from the boiler with a Ø 61
1/16”
X
83/4
” / 170x222 gasket in between (rst soak the gasket
in warm water).
Assemble the ange with angled piece so that the angle is turned upward, with a 6
11/16”
X8
3/4”
/170x222 gasket in
between (rst soak the gasket in warm water) and fasten with 4 nuts H18.
• GT 530A-16 to GT 530A-25
Assemble the ange with angled piece so that the angle is turned upward, with a Ø 6
11/16”
X8
3/4”
/170x222 gasket in
between (rst soak the gasket in warm water) and fasten with 4 nuts H 18.
26. Assembling the supply ange on GT 530A-15 to Gt 530A-25
27. Installing the Flue Outlet
Carefully insert the 9/16”/15mm gasket in the groove of
the rear section and hold it in place with a few drops of
silicone.
Assembly + Set up
1
2










