Operation Manual
34
GT 530A DDR_G30A/AE _IO_V4.0 09/2013
Assembly + Set up
17
Assembling the bafe
Boiler GT 530A -15 to 19 GT 530A-20 to 25
Total number of bafes 6 8
Package no. CM 22 + CM 23 2XCM 23
Boiler GT 530AE -26 to 28 GT 530AE-29 to 32
Total number of bafes 8 10
Package no. 2XCM 23 2XCM23 + CM22
Put the bafes into place in the upper front ue ways, taking care to interlock them with each other before inserting them.










