Operation Manual
20
GT 530A DDR_G30A/AE _IO_V4.0 09/2013
Assembly + Set up
1
2
1
Boilers : 14, 16, 18, 20, 22, 24 sections
2
Boilers : 15, 17, 19, 21, 23, 25,26, 27,28, 29,30, 31,32, 33 sections
Establish the location of the frame on the basis of the opening direction of the boiler door and the length of the burner.
Leave enough clearance at the rear of the boiler for water connections and the distributing tube.
Fit the rear section on the frame, behind the fastening brackets (see detailed drawing) and prop it up.
Insert the lower assembly rods in the holes of the rear section and the fastening brackets of the frame, in order to
position the rear section correctly according to the frame
Clean all the openings in the section with a brush or a ne to medium wire wheel. Remove any deposit on the bottom of
the section.
1
2










