Operation Manual

25
GT 530ADDR_G30A/AE _IO_V4.0 09/2013
11
R1
Rear
F2
Front
Put in place the upper assembly rods in the two front and rear lugs. For 26-32 sections boilers, the provided extension
and coupling will be required.
Mount the 2 crosspieces (supplied in package MR245/246) with their bends turned backwards and fasten them to the
rods with an expansion spring, 1 nut and 1 washer
Remove the assembly tool.
R1
F2
Assembly + Set up