Operation Manual
20
De Dietrich Gas 310/610 ECO
It is advisable (preferable) to install the Gas 610 ECO as follows:
Place the crate c/w the boiler in the boiler room. Make sure there is enough room at one end of the crate
for the boiler and ramp and clearance for the crate to be removed (at least 10ft [3M]).
Place the 4 support pads under the adjustment bolts.
Use the adjusting bolts to jack up the boiler – lifting it clear of the wheels and with the top of the
condensate collector level.
Fit the siphon assembly.
Use the plastic packaging to protect the boiler until required for use.
Service side dimension ‘B’, for servicing it is recommended that an additional 8 inches [200mm] be
added, but is not absolutely required.
If the control is orientated to the short end, dimension A will need to be increased by 19.5 inches
[495mm].
IMPORTANT!
Always transport the boiler in the protective
packaging whenever possible.
Remove fixing strips, packaging lid and all other
packaging, leaving the boiler on the pallet.
Place the packaging lid on the end of the pallet,
creating a ramp – secure with screws.
Roll the boiler, on its wheels, off the pallet and
down the ramp to the boiler room floor.
WARNING!
Use retaining straps to control the rate of travel –
Do Not stand in front of the boiler!
Maneuver the boiler to required final position.
The pallet lid can be used as a rocking
ramp to convey the boiler over obstacles, such as
thresholds, etc.
IMPORTANT!!
The wheels are designed for
transport purposes only and MUST NOT be used
when the boiler is in its final position!
IMPORTANT!!
Additional protection may
be required if site conditions warrant it – overhead
builders working, etc.
IMPORTANT!!
Never stand on the boiler the boiler casing is not
designed for excessive force.
Do not install boiler on
carpet or other combustible materials.










