Owner Manual

7
4. Prepare remaining pre-mix concrete to a wet
damp mix and backfill the hole level to the
ground.
5. Ensure post is vertical on both sides using a
spirit level (adjust cords as required).
6. Allow 3 days to cure concrete before installing
crossbar.
To install crossbar
1. Position steel bracket between vertical post
and crossbar.
Note: Crossbar side with middle recess must
be facing out.
2. Place M8x124mm bolt in the middle of
the crossbar, through the steel bracket and
the vertical post, then affix nut and tighten
into position.
Retractable Clothesline Mounting Kit
Installation
To install vertical post
1. Mark recommended position and excavate a
hole 250–300mm square x 450mm minimum depth.
2. Prepare a wet damp pre-mix concrete,
approximately 10kg, and backfill the hole
250–300mm from ground level.
3. Place vertical post into the hole in upright
position with plastic cap facing upwards and
tie each length of cord onto 3 equally spaced
stakes on the ground.
Preparing site foundations
Important : Ensure selected position has
sufficient clearance on all sides considering
maximu
m string drying length or required space.
Recommended height position of line from
ground level to crossbar mounting hole is
user height + 100mm
Maximum wall/post to post distance of 7.0 metres.
4. Prepare remaining pre-mix concrete to a wet
damp mix and backfill the hole level to the
ground.
5. Ensure post is vertical on both sides using a
spirit level (adjust cords as required).
6. Allow 3 days to cure concrete before installing
crossbar.
To install crossbar
1. Position steel bracket between vertical post
and crossbar.
Note: Crossbar side with middle recess must
be facing out.
2. Place M8x124mm bolt in the middle of
the crossbar, through the steel bracket and
the vertical post, then affix nut and tighten
into position.
Retractable Clothesline Mounting Kit
Installation
To install vertical post
1. Mark recommended position and excavate a
hole 250–300mm square x 450mm minimum depth.
2. Prepare a wet damp pre-mix concrete,
approximately 10kg, and backfill the hole
250–300mm from ground level.
3. Place vertical post into the hole in upright
position with plastic cap facing upwards and
tie each length of cord onto 3 equally spaced
stakes on the ground.
Preparing site foundations
Important : Ensure selected position has
sufficient clearance on all sides considering
maximu
m string drying length or required space.
Recommended height position of line from
ground level to crossbar mounting hole is
user height + 100mm
Maximum wall/post to post distance of 7.0 metres.
Posición del orificio retráctil de 6 líneas Daytek (811mm / 31,93”)
Posición del orificio retráctil de 6 líneas de Wattle (737mm / 29,02“)
Posición del orificio retráctil de 5 líneas Daytek (681mm / 26,81”)
Posición del orificio retráctil de 4 líneas Daytek (551mm / 21,69”)
Posición del pasamanos de 6 líneas Wattle
Posición del pasamanos de 5 líneas Daytek
Posición del pasamanos Daytek de 4 y 6 líneas
Línea central
112.5mm (4.43”) 112.5mm (4.43”)
295mm (11.61”)
355mm (13.98”)
425mm (16.73”)
464mm (18.27)
Figura 2 Tendedero retráctil para exteriores y posiciones de los orificios del pasamanos
Para instalar la barra transversal
1. Coloque el soporte de acero entre el poste vertical
y la barra transversal. Nota: El lado de la barra
transversal con el hueco central debe mirar hacia
afuera.
2. Coloque un perno M8 x 124 mm (4 7/8 ”) en el medio
de la barra transversal, a través del soporte de
acero y el poste vertical, luego fije la tuerca y
apriete en su posición.
SOPORTE DE PLÁSTICO
PERNO 2 Y 4
PERNO 1 Y 3
M8 X 65 MM (2 9/16“)
X 4 TORNILLO DE
ENTRENADOR
TORNILLO COACH + TUERCA M8 x 124 mm
(4 7/8 ”) a través del centro de la barra
transversal, soporte de acero y poste vertical
Figura 3