Owner Manual
4
To mount the Hand Rail bracket
(Daytek or Wattle brand)
1. Discard plastic brackets supplied with kit
2. Check correct bracket mounting hole position (see
Figure 2). Using four M8 x 65mm (2 9/16”) bolts, affix
nuts and tighten into position
3. For Wattle brand Hand Rail, bolt bracket (supplied
with cabinet) into the crossbar using two M8 x
65mm (2 9/16”) bolts, affix nut and tighten into
position.
To install crossbar
1. Position steel bracket between vertical post and
crossbar. Note: Crossbar side with middle recess
must be facing out.
2. Place M8 x 124mm (4 7/8”) bolt in the middle of the
crossbar, through the steel bracket and the vertical
post, then affix nut and tighten into position.
To mount the Retractable Clothesline unit
(Daytek or Wattle brand)
1. Check correct cabinet mounting hole position (see
Figure 2).
Optional: Daytek brand can be installed with or
without plastic brackets.
2. For Wattle/Daytek, slide plastic bracket onto each
end of crossbar and line them up with the correct
mounting hole positions
3. For Wattle insert our M8 x 65mm (2 9/16”) bolts into
hole position (For Daytek insert two M8 x 65mm
bolts (2 9/16”) through crossbar hole position), affix
nuts, but do not tighten(see Figure 3)
4. Carefully lift the cabinet unit and secure back
mounting holes onto M8 x 65mm (2 9/16”) bolts in
position
5. Ensure cabinet is flat before tightening all nuts.
Figure 3
4. Prepare remaining pre-mix concrete to a wet
damp mix and backfill the hole level to the
ground.
5. Ensure post is vertical on both sides using a
spirit level (adjust cords as required).
6. Allow 3 days to cure concrete before installing
crossbar.
To install crossbar
1. Position steel bracket between vertical post
and crossbar.
Note: Crossbar side with middle recess must
be facing out.
2. Place M8x124mm bolt in the middle of
the crossbar, through the steel bracket and
the vertical post, then affix nut and tighten
into position.
Retractable Clothesline Mounting Kit
Installation
To install vertical post
1. Mark recommended position and excavate a
hole 250–300mm square x 450mm minimum depth.
2. Prepare a wet damp pre-mix concrete,
approximately 10kg, and backfill the hole
250–300mm from ground level.
3. Place vertical post into the hole in upright
position with plastic cap facing upwards and
tie each length of cord onto 3 equally spaced
stakes on the ground.
Preparing site foundations
Important : Ensure selected position has
sufficient clearance on all sides considering
maximu
m string drying length or required space.
Recommended height position of line from
ground level to crossbar mounting hole is
user height + 100mm
Maximum wall/post to post distance of 7.0 metres.
PLASTIC BRACKET
BOLT 2 & 4
BOLT 1 & 3
M8 X 65MM (2 9/16”)
X 4 COACH BOLT
M8 x 124mm (4 7/8”) COACH BOLT +
NUT through cross bar center, steel
bracket and vertical post