Specifications
ww w. daxib.c om
INSTALLATION GUIDE DAX-8255C
i
Connect Pipe
Connect Nut
Gasket
Handwheel
Locking Cover
Basin Deck
Inlet Valve
Rubber Gasket
Locking Gasket
Hexagonal Nut
Locking Screw
Phillips Screwdriver
Faucet Body
Gasket
Rubber Gasket
Locking Gasket
Locking Nut
M5 Screw
Tee Pipe Coupling
INSTALLATION STEPS
1. Remove locking covers from the two inlet valves and take off the handwheels. Screw off the hexagonal nut to bottom. Then
place the valve bottom-up through the basin deck hole (attention to red left and blue right) and keep the outlets of the
two valves opposite towards each other. Then install the handwheels. Tighten the locking nut rst and then the hexagonal
nut. Screw them tightly with four locking nuts.
2. Remove the locking nut, locking gasket and rubber gasket off the faucet body. Put the gasket onto the faucet body and
slide it up through the basin deck hole. Then put on the rubber gasket and the locking gasket. Screw the locking nut with
M5 screw and screw the tee pipe coupling.
3. Connect the valves and the tee pipe coupling with the connect pipes and screw the connect nuts tightly.
4. Turn on water for inspection.