Owner manual
is not properly orientated. Make
visible, screw on and tighten the
sealing nut to finish the installation of
STEP 4 - CHECK PIPE WORK
Make sure the final assembled position
®
will align well with the
mains and rainwater pipe.
®
should be
assembled so that the mains water
supply to the unit and rainwater outlet to
toilets and laundry connect easily to the
plumbing on the same level.
STEP 5 - CONNECT PUMP TO
RAINBANK
®
®
STEP 6 - CONNECT PIPES
®
to the mains water
and delivery pipe plumbing.
IMPORTANT
copper pipes that allow some
movement so that they can line
Tighten Sealing Nut
Insert Float
Drill Hole
ø 22mm
18 19
‘UP’
Tighten Compression Nut
inside tank
or very thick plastic walled tanks.
that can be lowered into the top of
Work out the correct position for
corrugated profile tank wall this is
as shown below.
switch relative to the pump outlet.
does not interfere with the operation
of the switch.
®
and plug
comfortably into it.
1. Drill a 22mm hole in the side of the
drill is the best tool for this job.
corrugated tank you should make sure
between the radii as shown below.
loosened so that the sealing grommet
nut and insert the switch into the hole
as below.
Centre hole on flat section of profile
Diameter of hole must be 22mm.
Note: Ensure level sensor is installed
with ‘UP’ facing up
150
40
100
Slab
To
Pum
p