User guide
6
MOUNTING OF PACKAGES 2, 3, 4
- Make sure the 12 screws of the flange are correctly fastened without using excessive force.
- Cut out the liner along the inside of the flange by using a cutter.
- Remove the protective shield attached to the Jet Body with three M5 screws length 10.
CONNECTING:
-Connect the  small  capillary tube to  the back of  the  Control Button, and  pass  it under the  air
intake pipe, then through the slit foreseen for this purpose on the Air Regulation Button.
-Now slide capillary tube through reinforced hose connected to Jet Body.
CAUTION: the far end of the air intake pipe must be placed above water level.
-Do not forget to place the blue tube filter at the far end of
the air intake pipe.
-Fix  the  air  intake  pipe  to  the  wall  of  the  premises  using
hook provided.
FIXING JET FACE:
-Once  all  previous  instructions  have  been
carried  out,  screw  the  Jet  Face  to  the  Jet
Body  by  using  three  fixation  screws M5
length 30.








