User guide
3
CONCRETE
DRILLING:
Position the pattern on the inside casing taking
the 400 mm linear dimension between the axis
XY and the top of the structure into account.
CAUTION:  Make  sure  you  position  axis  XY
parallel to the top of the structure.
Pierce the  2 mounting  bolt holes  of 6  mm
diameter in A and B.
MOUNTING OF PACKAGE 1 ON THE JET BODY:
1. Placing of the self-adhesive Gasket:
Clean the pre-drilled side of the Counter Flange (2) then stick Gasket (4) to Counter Flange.
2. Mounting of the Jet Body:
Place  the  Counter  Flange  (2)  at  the rear  of  the  Jet  Body (1)  and  fix the  whole  device  to  the
inside casing by using the 2 fixation screws A and B.
Make sure the outer casing is fixed to the sleeves so that the concrete cannot enter. If this is not
the case, use a piece of polystyrene to fill the gap.
CAUTION: Fix the air intake pipe against the wall of the premises, above water level, by using
the hook provided for said purpose.








