Specifications

Datsun
Fuel
System
SECONDARY
THROTTLE
VALVE
A
74mml
PRIMARY
THROTTLE
VALVE
Fig
51
Interlock
opemng
adjustment
throttle
valve
480
from
fully
closed
posItIOn
and
measure
A
be
tween
the
throttle
valve
and
the
throttle
chamber
InsIde
wall
FIg
51
2
Wahout
dIsturbIng
the
settIng
bend
the
connectmg
rod
as
neces
sary
so
that
the
secondary
throttle
valve
IS
about
to
open
Check
to
make
sure
the
lInkage
system
works
smoothly
It
Will
only
take
about
15
mmutes
to
do
thIS
Job
Dash
Pot
Adjustment
Automatic
TransmissIOn
Models
Only
Make
sure
the
Idle
mixture
and
Idle
speed
are
adjusted
correctly
2
Start
the
engme
and
let
a
Idle
untIl
warmed
up
Top
radiator
hose
IS
warm
3
Attach
a
tachometer
according
to
the
man
ufacturer
s
InstructIOns
and
loosen
the
dash
pot
locknut
FIg
52
4
Turn
the throttle
valve
by
hand
until
the
dash
pot
Just
reaches
the
stopper
lever
5
Adjust
the
posItIOn
of
the
dash
pot
by
turnmg
the
adjusting
nut
untIl
engine
speed
IS
between
1
500
to
2
000
rpm
With
the
dash
pot
Just
touchmg
the
stopper
lever
6
TIghten
the
locknut
7
Bnefly
accelerate
the
engine
and
let
It
slow
down
to
Idle
speed
TIns
should
take about
three
seconds
If
not
repeat
steps
4
5
and
6
untIl
the
55