Specifications

1006-0939-000 3-1
3-1
II
II
mm
mm
pp
pp
oo
oo
rr
rr
tt
tt
aa
aa
nn
nn
tt
tt
Datex-Ohmeda strongly recommends that you use O
2
monitoring with this equipment.
Refer to local standards for mandatory monitoring.
II
II
mm
mm
pp
pp
oo
oo
rr
rr
tt
tt
aa
aa
nn
nn
tt
tt
European Standard EN 740 requires anesthetic agent monitoring when anesthetic
vaporizers are in use.
II
II
mm
mm
pp
pp
oo
oo
rr
rr
tt
tt
aa
aa
nn
nn
tt
tt
European Standard EN 740 requires CO
2
monitoring during ventilation.
ww
ww
WW
WW
AA
AA
RR
RR
NN
NN
II
II
NN
NN
GG
GG
SS
SS
Always make sure that the pipeline supply hoses and the breathing circuit
components are not toxic and will not:
Cause an allergic reaction in the patient.
React with the anesthetic gases or agent to produce dangerous
by-products.
ww
ww
To prevent incorrect values or equipment malfunction, use only
Datex-Ohmeda cables, hoses and tubing.
ww
ww
This system operates correctly at the electrical interference levels of IEC
601-1-2. Higher levels can cause nuisance alarms that may stop
mechanical ventilation.
ww
ww
To help prevent false alarms from devices with high-intensity electrical
fields:
Keep the electrosurgical leads away from the breathing system and the
flow and oxygen sensors.
Do not put the electrosurgical leads on any part of the anesthesia system.
ww
ww
To protect the patient when electrosurgical equipment is used:
Monitor the correct operation of all life support and monitoring equipment.
Keep backup manual ventilation available in case the electrosurgical
equipment prevents safe use of the ventilator.
Do not use conductive masks or hoses.
In this section Breathing system setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-2
Canister setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6
Pneumatic and electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8
How to install gas cylinders (high-pressure leak test) . . . . . . . . . . . . . . . . . . . . . . .3-11
How to attach equipment to the top shelves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-15
How to install equipment on the foldout shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-17
Installation notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-18
3 Setup and Connections