Specifications

Engineering Standard NSW
Signalling SMS 02
Cerberus Level Crossing Monitor Equipment
March 2005 Version 1.2 © Australian Rail Track Corporation Page 4 of 118
This document is uncontrolled when printed.
Document History
Primary Source ARTC Standard SC 01 51 00 00 EQ Version 3.0
List of Amendments
ISSUE DATE CLAUSE DESCRIPTION
1.1 01/09/2004 Reformatting to ARTC Standard
1.2 14/03/2005 Disclaimer Minor editorial change