Specifications

Engineering Standard NSW
Signalling SMS 02
Cerberus Level Crossing Monitor Equipment
March 2005 Version 1.2 © Australian Rail Track Corporation Page 112 of 118
This document is uncontrolled when printed.
Appendix B Level Crossing Monitor - Test and
Commissioning Form
Location: Kilometerage:
Monitor powers
up:
Name set:
Code: Crossing ID
number:
Data: Pin numbers set
Date and Time set Log cleared:
System test: Monitor reset:
Dialup on fault
and warning
enabled
Maintenance
facility enabled
Current sensor no current output voltages
Country side lamps: Sydney side lamps:
Country side tip: Sydney side tip:
Battery test:
Installation inspected and correct:
SCADA 2000 A Link 12-13 installed:
SCADA 2000 A Link 13-14 removed:
EPROM installed correctly and labelled:
Input information displayed and checked:
Output information displayed and checked:
Intermediate information displayed and checked:
Timer information displayed and checked:
Analogue information displayed and checked:
Battery charger adjustment correct for additional load: