Specifications

RailCorp Engineering Manual — Signals — Equipment Manual
Cerberus Level Crossing Monitor Field Equipment Manual TMG E1261
© RailCorp Page 50 of 89
Issued August 2012 UNCONTROLLED WHEN PRINTED Version 2.1
3.2 Tools and Maintenance
A number 1 posidrive screwdriver is required to remove the lid of the main box.
A 2.5 mm flat blade screwdriver is required to remove individual wires from the
connectors used on most modules in the system.
A multimeter is required for most fault finding.
A portable PC with a copy of the program LX_MAINT.exe is required.
A suitable 9 pin female to 9 pin female null modem serial cable with possibly a 25 pin to 9
pin converter if required for the PC. Note that the level crossing monitor end of the cable
needs a moulded plug with loopback for CD to DTR and RTS to CTS.
Null Modem cable connections
D9 Female (PC) D9 Female (LXMON)
2 RX
3 TX
3 TX
2 RX
5 SG
5 SG
1 CD 4 DTR (loop
Back)
1 CD 4 DTR (loop
Back)
7 RTS 8 CTS (loop
Back)
7 RTS 8 CTS (loop
Back)
The D9 Female connector at the level crossing monitor end requires a moulded (flush
fitting) connector if it is used with a V1.0 monitor. This is due to the recessed serial ports
used on the V1.0 monitor. The new V3.0 level crossing monitor does not have recessed
serial ports and can use D9 connectors with any type of backshell.
A 28 pin IC extractor for removing EPROMs.
3.3 Maintenance Instructions
Prior to conducting routine maintenance of the Level Crossing Signalling equipment the
Fault Reset button on the Monitor should be pushed and held for 5 seconds. This places
the level crossing monitor in maintenance disable mode. The Logic indication should be
flashing once per second which indicates that the monitor has had its reporting of status
changes disabled temporarily.
When in this state the monitor will not report changes of status to the Control Centre. It is
cancelled by a momentary push of the Fault Reset button or at pre-programmed interval
after activation. Normally this time-out is set at 45 minutes.
At the completion of the maintenance tasks all Faults and Warnings must be cleared
before cancelling this mode otherwise they will be reported to the Control Centre. The
maintenance disable state is cleared by a 0.5 second press of the Fault reset button.
When investigating level crossing faults and using the monitor it is important to download
the event log to disk before erasing/deleting the event log.