Specifications

RailCorp Engineering Manual — Signals — Equipment Manual
Cerberus Level Crossing Monitor Field Equipment Manual TMG E1261
© RailCorp Page 2 of 89
Issued August 2012 UNCONTROLLED WHEN PRINTED Version 2.1
Document control
Version Date Summary of change
2.0 10 January 2012 Rail Access Corporation document SC 01 51 00 00 EQ
Cerberus Level Crossing Monitor Equipment Manual has
been renumbered to TMG E1261 and TMA 400 format
applied. Logging information in Cerberus has been changed
from 10,000 to 8,000 to be consistent with SPG 1260 “Level
Crossing Monitor Requirements”. Reference to spec 1069
has been removed at the request of CES (Warwick Allison).
Section 2.1 list of indications updated to be the same as for
SPG 1260.
2.1 22 August 2012 Amended section 2.12
This document supersedes Rail Access Corporation (RAC) document SC 01 51 00 00 EQ Cerberus
Level Crossing Monitor Equipment Manual version 1.0 published in June 1997.
Summary of changes from previous version
Summary of change Section
Delete sample signage. Delete text This additional signage and phone number is
required to allow easier access for the public to notify the rail operators of potential
faults or damage at the level crossing. The following example sign or something similar
is to be installed on the level crossing which uses remote battery testing.
2.12
Replace text ‘some additional’ with ‘identification’. Add new sentence “The signs shall be
in accordance with SPC 521 ‘Level Crossing Identification Sign’, and SPG 0724.
2.12
Delete the two paragraphs immediately after the sample sign. I.e. Delete "The sign is to
be 600mm long x….." and delete "The phone number for reporting ……".
2.12