User's Manual
- 18 -
©
Datamatic, Ltd. 2007
Logical Switch D4100 MOSAIC Installation Procedure
The D4100 MOSAIC Logical Switch MUST be handled with care at all times. A drop or shock of any kind
could affect the performance of the Logical Switch. The Logical Switch is compatible with D4100 MOSAIC.
#1 Set the Reading Mode
• Set D4100 MOSAIC reading mode to Verify Mode.
#2 Clean the Register
Clean the register with a rag to make sure there is no mud or dirt that would get caught between the
collar and glass.
#3 Attach the Logical Switch to the Register
Place the Logical Switch on the register and secure with the two screws attached on the switch.
Final Logical Switch D4100 MOSAIC Installation Steps
1. Mount the D4100 MOSAIC box with the threaded neck pointing up.
2. Mounting can be accomplished by attaching to a wall, stake or through hole in meter box/vault lid.
3. Typical meter pits will use an 18” long ¾” PVC stake with drilled holes. Push the stake into the
ground approx. 6” deep, adjacent to the meter register.
4. Attach the D4100 MOSAIC to the stake with the zip ties (6” or 14”) utilizing the holes in the PVC.
5. If utilizing a lid lock, make certain not to over-tighten the D4100 MOSAIC within the lock.
6. Check for lid clearance; be sure to never rest the weight of the meter lid on the D4100 MOSAIC.
7. Pick up all trash in and around the pit or installation area.
8. Secure the lid back on the pit.
Initial installation and programming of D4100 MOSAIC is complete. The installation data gathered
should now be emailed to Datamatic. Then, proceed to the Read and Verify Procedure steps.
Below is an example of a Logical Switch D4100 MOSAIC installation: