Installation manual
BHS AND REDS INSTALLATION MANUAL
42
6
REDS Additional Frame Kit Bill Of Materials:
Drawing Ref.
Qty
Item
Code
R4
2
Bosch Profile 45x45L L = 388 mm
3.842.511.702
R7 (or R16)
1
Bosch Profile 45x45L L = 580 mm
3.842.511.702
R11
1
Bosch Bracket 45x180 for foundation mounting
3.842.523.583
R12
8
Bosch Angular Bracket 45x45
3.842.523.558
R16 (or R7)
1
Bosch Profile 45x45L L = 200 mm
3.842.511.702
R18
1
Bosch Profile 45x45L L = 1400 mm
3.842.511.702
19
T-bolts M8x25 for frame and scanner mounting
3.842.528.718
19
T-nuts M8 for frame and scanner mounting
3.842.345.081
6.2.2 Additional REDS Devices and Parts
In addition to the devices provided in the Standard BHS kit, the following parts are necessary
to construct the redundancy station:
Name
Qty
Description
Part Number
SC6000
1
SC6000-1200 Universal Controller, Ethernet
935701000
PWO-480
1
J-box power unit 110/230 VAC 24 V 480 W
93ACC1767
CAB-SC6013
1
25p cable SC6000 to PWO PWR/NET, 3 m
(for Power/Net connections)
93A051337
CAB-SC6003
1
25p cable SC6000 to PWO I/O, 3 m
(for Extended I/O connections)
93A051338
CAB-SC6103
1
9p cable SC6000 to PWO, 3 m
(for serial connections if used)
93A051294
CAB-PWO 03
1
17p cable PWO to PWO, 3 m (for redundancy)
93A051295
BTK-8100
1
Bus terminator kit (5 pcs)
93ACC1090
MEP-593
1
Photocell kit - PNP (PH-1)
93ACC1791
OEK-2
1
Optical Encoder (10 m Cable + Spring)
93ACC1770
6.2.3 Presence Sensor Mounting
Both photocells must give to the controllers the same information at the same time, so some
precautions must be taken:
The photocells must detect the same number of objects.
The photocells must detect the same length of the object.
If it is possible, avoid mounting the photocells at the beginning of the conveyor belt
because the packages usually jump passing from one belt to the other.
There are two possibilities to connect the two photocells.