User Manual

Table Of Contents
28 PowerScan RF Scanner
Figure 14. Mounting Using Key Slots
Using
Mounting
Flanges
Refer to Figure 15a and follow these steps:
1. Once you have identified the desired area for permanent Base
Station installation, hold the unit in place and mark the posi-
tion of screws using the "mounting flanges."
2. Start and remove four screws (provided) at the marked posi-
tions in the mounting surface.
3. Ensure that power and interface cables are securely connected
and routed in the channels provided in the bottom of the Base
Station.
4. Secure the Base Station to the surface by installing the four
screws into the mounting flanges. Base Station attachment is
now complete.
1. Key Slots 2.
#8 x 1" (4.1mm x 25.4mm) Pan
Head Screw
BA
SE ID
T
X/RX
C
HAR
G
E
PO
W
E
R
1
2